.53df8dbc4d8f4323c98b.png)
.d33cc48c2a6523b3b532.png)
.ab11fc94fa5abfbbc857.png)
Client
Capital Development Authority, Islamabad
Project type
Roads/Highways
Location
Islamabad, Pakistan
Year
2015
Construction of 04KM of length either side with 4-Lane on each side along-with grade separated facility from Zero Point to Faizabad Interchange and Construction of Interchange at I-8 Intersection, Islamabad including complete Horticulture / Landscaping and Strom water Drainage system(Phase-I).